News


The Falcon Hotel – Stratford-Upon-Avon

External View 1

ECA have been appointed by Stepnell Construction to design and install the Electrical services on the multi million pound project at The Falcon Hotel in Stratford-Upon-Avon. The grade 2 listed 83 bedroom Falcon Hotel is an iconic and charming hotel with a frontage dating back to the late 15th century, in the heart of the…

Read More


InterContinental London Park Lane Hotel – Offices

15165_01_N37_medium

ECA have been appointed by Phelan Construction to design and install the Electrical services on the IHG hotel offices within the exclusive InterContinental Hotel on Park Lane in London. The hotel prides itself on having the best facilities in the capital with state of the art equipment. The InterContinental London Park Lane stands on the…

Read More


Tachbrook Park

Tachbrook 1

ECA have been appointed by MCS to design and install the Electrical services on the CAT A fit out and refurbishment of Tachbrook Park, Leamington Spa. Tachbrook Park is a well-established and well located business park in Warwick with good access routes to London and Birmingham. The development comprises the refurbishment of a three-storey office…

Read More


96 Bedroom Premier Inn at Headingley

external-elevation

Clegg Construction place order with Electrical Contractor ECA for the Design and Installation of the Electrical Services, for the proposed new Premier Inn Hotel in Leeds. ECA who are a Whitbread Framework Contractor will be working closely with Clegg Construction to co-ordinate the services on the refurbishment of the existing Arndale House in the center…

Read More


New Electrical Installation for 62 Bedroom Nursing Home for BUPA at Pebble Mill Birmingham

perspective-view_01

Metnor Construction have placed an order with ECA to design and install the Electrical Services at BUPA’s new 62 Bedroom Nursing Home, at the former BBC Site at Pebble Mill in Birmingham. The BREEAM Excellent building will consist of a Ground, 1st and 2nd Floor, along with an ancillary terrace. In addition to the 62…

Read More


ECA appointed as Whitbread Framework Contractor for Premier Inn

Premier Inn logo

ECA are delighted that Whitbread PLC have appointed them on to their Framework to undertake the ongoing design & installation of The Electrical services on their Premier Inns projects. At the same time, we have been awarded the contract to undertake the new Premier Inn at Cumberland Place in Southampton. ECA have an excellent record…

Read More


Pratts Hotel Bath

Undercroft Bedrooms

ECA have secured the Electrical Installation on  the £10m refurbishment of the 18th Century, Grade I-listed listed Pratts Hotel in Bath. Located just a 5 minute walk from Bath Abbey and The Roman Baths, the hotel will undergo extensive structural alterations and be combined with a number of neighbouring Grade I-listed Georgian buildings, forming 117-bedroom Hotel Indigo…

Read More


11 New Industrial Warehouse Units in Yate

MCS have awarded ECA the design & Instalation contract for 11 Industrial Warehouse Units in Yate, which are being built by Chancery Gate. The 11 units range from 328 sqm upto 1630 sqm. Industrial Warehouse Units

Read More


ECA £2.5m Luxury Park Regis Hotel Competion

Park Regis Birmingham

ECA’s have just completed the £2.5m Electrical design and installation at Birmingham’s newest luxury hotel the Park Regis at Five Ways Birmingham. The Brand new upscale Hotel consists of 253 rooms, along with Urban Spa, Business Centre and Gym. The top floor Rofuto restaurant is the highest restaurant in Birmingham and the project also consisted…

Read More


Most Recent Projects

A selection of our clients

Travelodge Hampton Finning CAT Ibis Premier Inn

Our Accreditations

NICEIC Safe Contractor CHAS RECC CIBSE Low Carbon Consultants Constructionline MCS